Montages électroniques

Electronic projects

Maturity : 100%

Camera mounted on the chassis of an N-scale dumper wagon, with access to the video stream in real time via the WIFI network.

Maturity : 100%

Microcontroller for interconnection between a PC and a rail network to control locomotives, points and other accessories.

Maturity : 30%

Different shapes of N-scale light panels with electronic control assemblies.

Maturity : 30%

Complete automated management of an evolving rail network.


What does the state of maturity of the projects correspond to ?

This site offers a range of electronic assemblies that can be built and used on your networks. During the design and development phase, the project maturity level increases and shows you the project's progress:

  • up to 25%: proof-of-concept (POC) allows you to quickly check the operation of sensitive or contentious project points
  • between 26 and 50%: rapid development of the entire project (using breadboards and Dupont wires)
  • between 51 and 75%: the project is valid, but not all design assumptions have yet been definitively realized, or certain adaptations have become necessary
  • between 76 and 95%: The project is now fully functional, but there are still a few tests to be carried out, including component temperature rise as a function of operating time, power consumption in different configurations, etc...
  • between 96 and 100%: and last but not least, minor aesthetic adjustments that have no impact on the project's operation. You can use it with your eyes closed!